Revenue is not margin. Start with places actually paid for, then subtract materials used, preparation and teaching time, space and payment costs. Recalculate whenever the duration, group size or what is included changes.
See how Aforo Arts handles thisWhat does this session earn?
Enter amounts excluding VAT. Other costs should include preparation, teaching, space and payment fees.
Balance = paid places × (revenue per place − materials per person) − other costs.
Enter paid places and revenue per place to see the calculation.
Start with money collected
Price multiplied by maximum capacity is a best-case scenario, not a result. Use paid bookings and separate discounts, refunds and deposits still outstanding.
- Count paid guests, not just registrations.
- Separate workshop revenue from taxes and refunds.
- Do not count a deposit again when the balance is paid.
Work out the cost per place
Paint, clay, canvases and drinks vary with attendance. Record what is actually used and allow for reasonable waste where the format requires it.
- List materials included in the price.
- Separate consumables from reusable tools.
- Update costs when the supplier or format changes.
Cost the time and the room
The session starts before guests arrive. Preparation, cleaning, messages and collection take time too. If you own the space, assign a share of its cost to the workshop.
- Record preparation, teaching and closing hours.
- Include everyone working on the session.
- Allocate rent and room costs consistently.
Decide with margin, not a photo of a full room
Subtract session costs from revenue collected. Then compare like-for-like formats. A smaller group with a different price, duration or optional material may work better.
- Compare equivalent sessions, not total sales alone.
- Set a minimum number of places before the workshop runs.
- Decide what to change before publishing the next date.
Bring your activities into Aforo Arts
Show us how you run courses, workshops and groups. We will walk through your formats.

